Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • The First phase of the Market Test for the floating LNG Terminal in Alexandroupolis was successfully completed
    édité le 07/01/2019 - Plus de news de "Gastrade" - Voir la fiche entreprise de "Gastrade"


The First phase of the Market Test for the floating LNG Terminal in Alexandroupolis was successfully completed
The first phase of the Market Test for the reservation of regasification capacity at the floating LNG Terminal in Alexandroupolis, which is being developed by the Greek utility GASTRADE S.A., was completed with great success on 31 December 2018.

Twenty companies submitted relevant Expression of Interest for a total of up to 12.2 billion cubic meters / year of regasification capacity reservation at the floating terminal and delivery to the Greek National Natural Gas Transmission System. These gas quantities will be directed towards the markets of the wider Southeastern European region. The Expression of Interest surpassed the technical capacity of the project which is designed at 5.5 bcm/ year.

Companies that have expressed interest in the Market Test cover a wide range of geography. Apart from the SEE region, a large part of the major international gas traders also expressed interest in the project.

"The highly successful outcome of the first phase of the Market Test and the great interest expressed for the Alexandroupolis LNG project by many important regional and international gas players is an essential step for the implementation of the project and ultimately for the upgrade of the energy position and the energy supply diversification of Greece, Bulgaria and the SE Europe as a whole" said Mr. Konstantinos Spyropoulos, Managing Director of GASTRADE.

The process of the first phase of the Market Test was initiated on 30 October 2018 and was conducted under the guidance and supervision of the Regulatory Authority for Energy of Greece (RAE) and in accordance with the Guidelines for Management and Allocation of Capacity approved by RAE in line with the provisions of paragraph 6 of Article 36 of the European Directive 2009/73/EC.

The Project will proceed to the next Binding Phase of the Market Test, once the relevant new Guidelines and Notice to the companies that will participate in this next phase are approved by RAE.

About Gastrade

GASTRADE S.A. is a utility company which develops, exploits, operates and manages natural gas systems in a safe, reliable and financially sound manner.

GASTRADE S.A. studies, designs, develops, operates and exploits infrastructures which are necessary for the reception, transmission and distribution of natural gas as well as for its storage, liquefaction and re-gasification.

GASTRADE S.A. is the first enterprise operating in Greece that has received a license for an Independent Natural Gas System from the Ministry of Environment, Energy and Climate Change on 19-8-2011 (ΑΔΑ: 4ΑΜΦ0-2ΣΠ) in line with the positive opinion of the Greek National Regulatory Authority (NRA) for Energy (decision 29/2011 of 25-7-2011).


Origine : Communiqué Gastrade

Voir la fiche entreprise de "Gastrade"





Les dernières news de "Gastrade"

 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024