Tellurian Inc. announced that the U.S. Federal Energy Regulatory Commission (FERC) has issued the order granting authorization for Driftwood LNG, a proposed ~27.6 million tonnes per annum (mtpa) liquefaction export facility near Lake Charles, Louisiana, and the associated Driftwood pipeline, a 96-mile proposed pipeline connecting to the facility (collectively, the Driftwood project).
President and CEO Meg Gentle said, “Tellurian thanks FERC and other state and federal agencies for their diligence and for working alongside our team over the past three years to ensure that we bring the Driftwood project to the market safely and efficiently. We look forward to beginning construction and delivering first LNG in 2023.”
Estimated Driftwood project timeline:
- Driftwood final investment decision: 2019
- Begin construction: 2019
- Begin operations: 2023
About Tellurian Inc.
Tellurian (Tellurian) (NASDAQ: TELL) was founded by Charif Souki and Martin Houston and is led by President and CEO Meg Gentle. Tellurian intends to create value for shareholders by building a low-cost, global natural gas business, profitably delivering natural gas to customers worldwide. Tellurian is developing a portfolio of natural gas production, LNG trading, and infrastructure that includes an ~ 27.6 mtpa LNG export facility and an associated pipeline. Tellurian is based in Houston, Texas, and its common stock is listed on the Nasdaq Capital Market under the symbol “TELL”.