Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Sulzer to Supply Six API 610 Barrel Casing Pump Sets to INPEX Australia
    édité le 11/12/2014 - Plus de news de "SULZER" - Voir la fiche entreprise de "SULZER"


Sulzer to Supply Six API 610 Barrel Casing Pump Sets to INPEX Australia
Sulzer has been contracted as the pumps provider for the critical liquids removal system of the INPEX-operated Ichthys liquefied natural gas (LNG) project in September 2014. The pumps will be installed on the offshore Central Processing Facility (CPF). Sulzer will deliver six large API 610 (ISO 13709) Barrel Casing Pump sets in 2015.
The scope of supply of the pumps includes the six pump skids with electric motors and complex seal systems, which are being manufactured, packaged, and tested in the Sulzer state-of-the-art test facility in Bruchsal, Germany. The installation of the pumps into the module will also be supervised by our experts in the Asia-Pacific region, with future offshore support from Sulzer Australia.

The Sulzer pump model GSG was chosen to meet very challenging mechanical and process requirements by INPEX to stringent project specifications. Some of the most critical requirements are very high suction pressure design with four operating cases on different liquids with various densities. The pumps are suitable for the future duties with only a cartridge retrofit to a fully staged pump and no change to the fixed speed electric motor. This gives the advantage of minimal downtime and ease of pump retrofit offshore.

The processing on the CPF will separate the gas from liquids. The Sulzer pumps will transport the liquids from the CPF to the FPSO (floating production storage and offloading unit), stationed about 3.5 km away.

Sulzer has previously received an award from INPEX for 69 API 610 pumps for the FPSO; the largest of these pumps are manufactured and tested in our factory in Germany.

About the Ichthys LNG Project

The Ichthys LNG Project is a joint venture between INPEX group companies, major partner Total and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas. The Ichthys LNG Project is expected to produce 8.4 million tons of LNG and 1.6 million tons of LPG per annum, along with approximately 100,000 barrels of condensate per date at peak.

About Sulzer

Sulzer offers a broad range of products and services for a large variety of applications. Based on our deep understanding of industry needs, our long experience, strong technical competencies, and continuous innovation, we can provide you outstanding reliability and performance.
Experience how Sulzer helps to cover the global demand for oil and gas. Pumps for up-, mid- and downstream applications, separation and process technologies for downstream applications, as well as services for rotating equipment are key elements of our portfolio.


Se the site of the Ichthys LNG Project


Origine : Communiqué SULZER

Voir la fiche entreprise de "SULZER"



Les dernières news de "SULZER"

 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024