Sarawak Shell Berhad (SSB), a subsidiary of Shell plc, has announced that gas production has started at its Timi platform in Malaysia under the SK318 production sharing contract (PSC).
Timi features Shell’s first wellhead platform in Malaysia that is powered by a solar and wind hybrid power system. This unmanned platform is also more cost efficient, as a result of it being around 60% lighter in weight, than a conventional tender-assisted drilling wellhead platform that relies on oil and gas for power.
“Timi demonstrates we are delivering more value with less emissions,” said Zoe Yujnovich, Shell’s Integrated Gas and Upstream Director. “Bringing the project online is also an example of our focus on performance, discipline, and simplification. It shows our ability to innovate and deliver safe, reliable, and sustainable projects that support a balanced energy transition for Malaysia.”
Timi is designed to produce up to 50,000 barrels of oil equivalent per day of gas at peak production and will evacuate its gas through a new 80 kilometres (km) pipeline to the F23 production hub. The project supports the future growth in the central Luconia area, off the coast of Sarawak.
Shell is proud of its long and successful history in Malaysia. Under the stewardship of Malaysia Petroleum Management, PETRONAS, Shell remains committed to supporting the country’s economic progress and energy transition efforts with competitive and resilient investments.
Notes:
- Timi is a sweet gas field discovered in 2018 under the SK318 PSC.
- Shell’s engineering expertise, early market engagement and competitive scoping resulted in a platform that is 60% lighter than conventional designs.
- Timi is developed as part of the SK318 PSC with SSB as the operator holding 75% equity. The other two partners are PETRONAS Carigali Sdn Bhd (15%) and Brunei Energy Exploration (10%).
- Timi is located around 252 km north-west of Bintulu, Sarawak, and 202 km north-west of Miri, Sarawak.
Prior to Timi, Shell Malaysia’s first fully solar powered wellhead platform, the Gorek field, located 145 km offshore Malaysia, achieved first gas production on May 24, 2020.
- In 2022, Shell Malaysia took a final investment decision on the Rosmari-Marjoram gas project, the largest integrated offshore and onshore project in Sarawak, which will be primarily powered by renewable energy. The offshore platform will use power from 240 solar panels, while the onshore plant is connected to the Sarawak grid system which is supplied mainly by hydroelectric plants.
About Shell plc
Shell plc is incorporated in England and Wales, has its headquarters in London and is listed on the London, Amsterdam, and New York stock exchanges. Shell companies have operations in more than 70 countries and territories with businesses including oil and gas exploration and production; production and marketing of liquefied natural gas and gas to liquids; manufacturing, marketing and shipping of oil products and chemicals and renewable energy projects.