Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Saudi Aramco: Giant tie-in platform installed
    édité le 12/12/2012 - Plus de news de "ARAMCO" - Voir la fiche entreprise de "ARAMCO"


Saudi Aramco: Giant tie-in platform installed
A new landmark was recently added to the world’s largest offshore oil field. Safaniya Tie-In Platform No. 20 (Safaniya TP-20) was installed using an uncommon installation technique called "float-over installation."

The platform, the largest TP in Saudi Aramco’s offshore fields, weighs 6,000 metric tons (compared with 2,000 tons for normal TPs) and will be the main crude oil gathering and power supply hub for North Safaniya offshore field.

The installation of Safaniya TP-20 is part of the first phase of a long-term plan to upgrade the Safaniya offshore field, called the Safaniya Master Plan. Since the early days of 2009, during the project’s planning phase, the team realized the magnitude of the platform due to the piping and electrical power requirements associated with it.

Careful measures and plans were developed to ensure successful construction and installation of the platform. Several construction workshops, design analyses and model reviews were conducted to review all aspects of the design and to ensure its safe installation.

One factor planners took into particular consideration was weather conditions under which the float installation would take place. The team conducted 10-year, three-year and one-year analyses of the historical weather conditions to select the optimal installation timeframe. Several supports and structures also were installed to ensure no damage occurred during the critical installation.

The platform fabrication took 20 months (between February 2011 and October 2012) at the fabrication yard at Jebel Ali. To supply the required electrical power to the North Safaniya offshore field, the platform will receive a 47 km, 3-core 230 kV composite submarine cable (power and fiber) that will be the longest of its kind in the world. The cable manufacturing is currently in its final stages and is scheduled to be installed in February 2015.

This tie-in platform recently installed in Safaniya is the largest of its kind in Saudi Aramco’s offshore fields.


Origine : Communiqué ARAMCO

Voir la fiche entreprise de "ARAMCO"



Les dernières news de "ARAMCO"



Toutes les news de "ARAMCO"
 
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 
Recherche de news par tags

abu-dhabi acquisition adnoc aker-bp aker-solutions algeria algerie algerie alstom amec anadarko angola apache australia axens azerbaijan baker-hughes barents-sea bechtel bg-group bp brazil canada carburant cbi cgg chevron china chiyoda cnooc cnpc co2 commission-europeenne compressor conocophillips consommation cpdp deepwater discovery drilling e-on edf egypt emerson engineering eni equinor equinor exxonmobil feed flng flowline fluor fluxys fmc foster-wheeler fpso fsru fugro gabon gas gaz gazprom gazprom-neft gdf-suez ge germany ghana gnl gtt gulf-of-mexico hess india indonesia inpex iraq italy jacobs jgc kbr keppel licence lng lukoil lundin maersk-drilling malaysia mcdermott methanier mozambique natural-gas nigeria nigeria nord-stream north-sea norway novatek offshore oman omv opec pemex petrobras petrofac petronas pgnig pipeline platform qatar qatar-petroleum qatargas raffinerie refinery repsol rig riser rosneft russia rwe saipem santos saudi-aramco schlumberger senegal shale-gas shell socar sonatrach south-stream statoil subsea subsea-7 survey tap technip technipfmc texas total transocean tullow turbine ufip uk us vallourec vopak well wintershall wood-group woodside



Europétrole © 2003 - 2021