Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • SAIPEM: New E&C Offshore contracts worth over USD1 billion to be executed by the newly-built FDS 2 vessel
    édité le 04/05/2011 - Plus de news de "SAIPEM" - Voir la fiche entreprise de "SAIPEM"


SAIPEM: New E&C Offshore contracts worth over USD1 billion to be executed by the newly-built FDS 2 vessel
Saipem has been awarded new E&C Offshore contracts worth in excess of $1 billion in China and Brazil.

The offshore activities for both the contracts will be performed mainly by the newly-built and highly-specialized Saipem FDS 2 vessel, in different periods between 2012 and 2013.

In China, Husky Oil China Ltd awarded Saipem the contract for the Liwan 3-1 Field – Deepwater EPCI. The scope of work includes the engineering, procurement, construction and installation of two 22 inch diameter 79-kilometres-long pipelines, umbilicals, along with the transport and installation of a subsea production system linking the wellheads to a processing platform.

The Liwan 3-1 gas field, is located in the Block 29/26 in the South China Sea in 1500 metres water depth and approximately 300 kilometres south of Hong Kong. It represents the first offshore field developed in deep water in the South China Sea.

In Brazil, the Brazilian oil company Petrobras has awarded Saipem an EPIC contract for the Guara & Lula-Northeast gas export pipelines, in the Santos Basin, approximately 260 kilometres off the coasts of the Rio de Janeiro and São Paulo States, in water depths of between 2,100 and 2,200 metres.

The contract encompasses the transportation, installation and pre-commissioning of two export sealines, as well as the engineering, procurement and construction of related subsea equipment: the first line, 18 inch in diameter and 54-kilometres-long, will connect the Guara FPSO vessel (Floating Production Storage and Offloading) to a subsea gathering manifold in the Lula field; the second line, 18 inch in diameter and 22-kilometres-long, will connect the Lula-Northeast FPSO to the same manifold in the Lula field.


Origine : Communiqué SAIPEM

Voir la fiche entreprise de "SAIPEM"



Les dernières news de "SAIPEM"



Toutes les news de "SAIPEM"
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024