Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Perenco Gabon exploration campaign restart
    édité le 08/09/2011 - Plus de news de "PERENCO" - Voir la fiche entreprise de "PERENCO"


Perenco Gabon exploration campaign restart
The spud of NKO-1 well occurred August 29th 2011, following a complex rig move, from previous B?Oba location, in the Fernan Vaz lagoon.

Due to shallow water in the dry season, Rig Nabors BR301 was moved on the Ogooue River, then reached ocean to Port Gentil and eventually passed through a final Northern channel down to the current location - requiring specific dredging works.

Geoscience London in collaboration with the Gabonese Subsidiary teams optimized final surface coordinates with these constraints, allowing to explore the expected reservoir targets with a slightly deviated well profile.

Target is NTO, Azile and Cap Lopez reservoirs with a planned TD of about 2700mMD.

Rig is currently preparing 17-1/2?? section drilling after having completed 20?? top casing cementing job.


Origine : Communiqué PERENCO

Voir la fiche entreprise de "PERENCO"



Les dernières news de "PERENCO"

 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024