Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Over 1,100 kilometers of Power of Siberia gas pipeline to be completed by late 2017
    édité le 12/06/2017 - Plus de news de "GAZPROM" - Voir la fiche entreprise de "GAZPROM"


Over 1,100 kilometers of Power of Siberia gas pipeline to be completed by late 2017
The Gazprom in Eastern Russia, Entry into Asia-Pacific Markets Press Conference was held in Moscow today in the lead-up to the annual General Shareholders Meeting. The Press Conference featured Vitaly Markelov and Alexander Medvedev, Deputy Chairmen of the Management Committee, Vyacheslav Mikhalenko and Sergey Prozorov, Members of the Management Committee and Heads of Departments, Pavel Oderov, Head of Department, Alexander Kalinkin and Vasily Petlichenko, Deputy Heads of Departments, and Elena Burmistrova, Director General of Gazprom Export.

It was noted that Gazprom continued its active efforts within the projects under the Eastern Gas Program.

Particular attention at the Press Conference was paid to Russian gas supplies to China via the eastern route. The construction project for the Power of Siberia gas trunkline is ahead of schedule. By 2017, 445 kilometers of its linear part were built. As of early June 2017, some 774 kilometers were ready. Before the end of the year, it is planned to complete over 1,100 kilometers of the pipeline, which translates into about a half of Power of Siberia’s priority section stretching from the Chayandinskoye field in Yakutia to the Russian-Chinese border.

In accordance with the contract signed between Gazprom and CNPC, gas supplies to China via the eastern route will start in the period from May 2019 through May 2021. In May 2017, the parties began to negotiate the exact starting dates for the said gas deliveries.

Discussions continue over gas to be supplied to China via the western route and from Russia’s Far East.

It was also noted that the Asia-Pacific region was a traditional LNG market for Gazprom. Between 2005 and 2016, over 75 per cent of the Group’s LNG was shipped to the region. In 2016, the Company supplied 2.8 million tons of LNG to Asia-Pacific.

One of Gazprom’s top priorities is to ramp up gas sales in Asia-Pacific with the help of a third train of the LNG plant within the Sakhalin II project. It is planned to build a new production train similar to the two existing trains, with an annual capacity of up to 5.4 million tons of LNG. Design documentation for the construction project is being finalized as part of FEED.

About Gazprom

Gazprom is a global energy company. Its major business lines are geological exploration, production, transportation, storage, processing and sales of gas, gas condensate and oil, sales of gas as a vehicle fuel as well as generation and marketing of heat and electric power.


Origine : Communiqué GAZPROM

Voir la fiche entreprise de "GAZPROM"



Les dernières news de "GAZPROM"



Toutes les news de "GAZPROM"
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024