Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • KBR Awarded FEED and Project Management Services Contract by Saudi Aramco for the Jazan Refinery and Marine Terminal Project
    édité le 24/02/2012 - Plus de news de "KBR" - Voir la fiche entreprise de "KBR"


KBR Awarded FEED and Project Management Services Contract by Saudi Aramco for the Jazan Refinery and Marine Terminal Project
KBR announced that it has been awarded a contract by the Saudi Arabian Oil Company (Saudi Aramco) to provide front-end engineering and design (FEED), and Project Management Services (PMS) for its grassroots Jazan refinery, an anticipated 400,000 barrels per day (BPD) facility to be located in Jazan, Saudi Arabia.

KBR will provide FEED and PMS services to develop the process design, layout, integration and optimization of the facility, develop equipment and material specifications, prepare EPC bid packages and develop an estimate for the construction of the refinery. KBR will also assist Saudi Aramco in overseeing, managing and directing the work-related activities for all phases of the Jazan Refinery and Marine Terminal Project. KBR has also committed to execute part of the FEED in the Kingdom of Saudi Arabia. The Jazan Refinery and Terminal project is designed to provide a primary foundation industry for the Jazan Economic City development and to provide additional refined products to satisfy the growth in domestic demand within the Kingdom of Saudi Arabia. Work on the project is expected to begin in February 2011.

“KBR is pleased to be selected to take part in such a significant project for Saudi Aramco,” said John Quinn, President, KBR Downstream. “KBR is committed to providing Saudi Aramco with quality FEED and Project Management Services. Additionally, this award – along with our existing work at Ras Tanura. the Yanbu Refinery and the Shaybah NGL program – signifies KBR’s continued commitment to support Saudi Aramco development programs.”

To see the Jazan refinery site


Origine : Communiqué KBR

Voir la fiche entreprise de "KBR"



Les dernières news de "KBR"



Toutes les news de "KBR"
 
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 
Recherche de news par tags

abu-dhabi acquisition adnoc aker-bp aker-solutions algeria algerie algerie alstom amec anadarko angola apache australia axens azerbaijan baker-hughes barents-sea bechtel bg-group bp brazil canada carburant cbi cgg chevron china chiyoda cnooc cnpc co2 commission-europeenne compressor conocophillips consommation cpdp deepwater discovery drilling e-on edf egypt emerson engineering eni equinor exxonmobil feed flng flowline fluor fluxys fmc foster-wheeler fpso fsru fugro gabon gas gaz gazprom gazprom-neft gdf-suez ge ghana gnl gtt gulf-of-mexico hess india indonesia inpex iraq jacobs jgc kbr keppel licence lng lukoil lundin maersk-drilling malaysia mcdermott methanier mexico mozambique natural-gas nigeria nigeria nord-stream north-sea norway novatek offshore oman omv opec pdvsa pemex petrobras petrofac petronas pgnig pipeline platform qatar qatar-petroleum qatargas raffinerie refinery repsol rig riser rosneft russia rwe saipem santos saudi-aramco schlumberger seadrill senegal shale-gas shell socar sonatrach south-stream statoil subsea subsea-7 survey tap technip technipfmc texas total transocean tullow turbine ufip uk us vallourec vopak well wintershall wood-group woodside



Europétrole © 2003 - 2021