Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Gazprom: New production capacities at Bovanenkovskoye field and Bovanenkovo – Ukhta 2 gas pipeline enter operation
    édité le 19/01/2017 - Plus de news de "GAZPROM" - Voir la fiche entreprise de "GAZPROM"


Gazprom: New production capacities at Bovanenkovskoye field and Bovanenkovo – Ukhta 2 gas pipeline enter operation
The ceremonial inauguration of new production capacities and the Bovanenkovo – Ukhta 2 gas trunkline took place at the Bovanenkovskoye field.

The event was attended by Alexey Miller, Chairman of the Gazprom Management Committee, and heads of Gazprom's specialized structural units, subsidiaries and contracting organizations.

The ceremony featured an address by Russian President Vladimir Putin, who spoke via a conference call.

A major gas production center, which is strategic to Russia's gas industry, was established and is currently developed by Gazprom in the Yamal Peninsula. Faced with a challenging Artic environment, the Company set up a brand new and powerful industrial complex with a transport infrastructure and a full-fledged utility system. Yamal's largest field, Bovanenkovskoye, has two efficient production facilities with an aggregate design capacity of 90 billion cubic meters of gas per year. In addition, the Company has built a railroad, which includes the world's longest bridge beyond the Arctic Circle, and the first airport in Russia's modern history.

Step by step, Gazprom expands its production capacities at Bovanenkovskoye. The operating well stock added 88 wells today, bringing their total number to 391. Two booster compressor stations with a total capacity of 160 MW were brought online as well. The stations play a crucial role in the gas treatment process. With these facilities in operation, the field reached a new level of productivity, increasing its peak daily output from 218 million cubic meters to 264 million cubic meters of gas.

In parallel with boosting production capacities in Yamal, Gazprom actively expands the northern gas transmission corridor within Russia's Unified Gas Supply System, building new, highly efficient gas trunklines. The Bovanenkovo – Ukhta and Ukhta – Torzhok pipelines are already onstream.

The Bovanenkovo – Ukhta 2 gas pipeline also entered operation today. It comprises a 1,260-kilometer linear part and new shops (total capacity of 192 MW) at the Baidaratskaya and Intinskaya compressor stations. The pipeline's has a design capacity of 57.5 billion cubic meters of gas per year. The combined design throughput of Bovanenkovo – Ukhta and Bovanenkovo – Ukhta 2 is 115 billion cubic meters per year.

In the course of constructing new gas production and transmission facilities, Gazprom employed innovative technologies and state-of-the-art, highly reliable equipment, which had been manufactured in Russia. Gas well clusters are fully automated and provided with independent thermal stabilization systems for permafrost soils.

The Bovanenkovo – Ukhta 2 gas pipeline, similar to Bovanenkovo – Ukhta, was designed for the working pressure of 120 atm – the highest pressure for onshore gas pipelines. This was made possible thanks to the use of special high-strength pipes produced for Gazprom by Russian manufacturers.

In the medium term, it is planned to complete the construction of a third production facility at the Bovanenkovskoye field, as well as the Ukhta – Torzhok 2 gas pipeline and compressor capacities of Bovanenkovo – Ukhta 2. As a result, the field will reach its design capacity of 115 billion cubic meters per year, thus becoming one of Russia's most productive fields.

“Gazprom's main resource base is shifting northward to Yamal, where we make consistent efforts to develop the new gas production center that will secure gas supplies across Russia in the coming decades. The new gas pipeline, Bovanenkovo – Ukhta 2, commissioned today as part of the northern gas transmission corridor, reshapes the geography of gas flows for both domestic supplies and exports. The northern corridor becomes fundamental to gas supplies throughout European Russia and integral to the shortest, most reliable and efficient new route for gas exports to Europe, stretching from Yamal to Germany across the Baltic Sea. It is the Nord Stream 2 project, whose implementation is running on schedule,” said Alexey Miller.

About the Bovanenkovskoye field

With its initial gas reserves estimated at 4.9 trillion cubic meters, Bovanenkovskoye is the largest oil, gas and condensate field in the Yamal Peninsula. Field development is carried out by Gazprom Dobycha Nadym (a wholly-owned subsidiary of Gazprom).

At present, Bovanenkovskoye's Cenomanian-Aptian deposits are being developed. Field development started in 2012, when the first gas production facility (GP-2, 60 billion cubic meters of gas per year) was brought into service, with the second one (GP-1, 30 billion cubic meters of gas per year) commissioned in 2014. Actual gas production from the field increases gradually, reflecting the market demand. The field's output was 4.9 billion cubic meters of gas in 2012, 22.8 billion cubic meters in 2013, 42.8 billion cubic meters in 2014, 61.9 billion cubic meters in 2015, and 67.4 billion cubic meters in 2016.

Gas from the Bovanenkovskoye field flows into the Bovanenkovo – Ukhta and Bovanenkovo – Ukhta 2 gas trunklines, which run for about 1,260 kilometers each. The trunklines are operated by Gazprom Transgaz Ukhta (a wholly-owned subsidiary of Gazprom).
Bovanenkovo – Ukhta's linear part and priority compressor stations were brought into operation in 2012. The construction of the other compressor stations was completed between 2013 and 2014.

About Gazprom

Gazprom is a global energy company. Its major business lines are geological exploration, production, transportation, storage, processing and sales of gas, gas condensate and oil, sales of gas as a vehicle fuel as well as generation and marketing of heat and electric power.


Origine : Communiqué GAZPROM

Voir la fiche entreprise de "GAZPROM"



Les dernières news de "GAZPROM"



Toutes les news de "GAZPROM"
  geoenergydays
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 
Recherche de news par tags

abu-dhabi adnoc aker-solutions algeria alstom amec anadarko angola apache australia axens azerbaijan baker-hughes barents-sea bechtel bg-group bp brazil canada carburant cbi centrica cgg chevron china cnooc cnpc co2 commission-europeenne compressor conocophillips consommation cpdp deepwater discovery drilling e-on edf egypt emerson engie engineering eni equinor exxonmobil feed flng flowline fluor fluxys fmc foster-wheeler fpso fsru fugro gabon gas gaz gazprom gazprom-neft gdf-suez ge ghana gnl gouvernement gtt gulf-of-mexico hess ifp india indonesia inpex iraq jacobs jgc kbr keppel licence lng lukoil lundin maersk-drilling maersk-oil malaysia mcdermott mozambique natural-gas nigeria nigeria nord-stream north-sea norway novatek offshore oman omv opec pdvsa pemex petoro petrobras petrofac petronas pgnig pipeline platform qatar qatar-petroleum qatargas raffinerie refinery repsol rig riser rosneft russia rwe saipem santos saudi-aramco schlumberger seadrill shah-deniz shale-gas shell siemens sinopec socar sonangol sonatrach south-stream statoil subsea subsea-7 tap technip technipfmc total transocean tullow turbine ufip uk vallourec vessel vopak well wintershall wood-group woodside



Europétrole © 2003 - 2019