Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Gazprom Neft selects Petrofac as contractor to build an oil gathering andtreatment station at the Badra oil field in Iraq
    édité le 24/02/2012 - Plus de news de "Gazprom Neft" - Voir la fiche entreprise de "Gazprom Neft"


Gazprom Neft selects Petrofac as contractor to build an oil gathering andtreatment station at the Badra oil field in Iraq
Gazprom Neft, the development operator of the Badra oil field in Iraq, has chosen a contractor to build the central oil gathering & treatment station following a tender. The EPC contract, valued at $329 million, which includes detailed design, engineering, procurement, construction, launch, testing and commissioning work, was handed to Petrofac.The contract was approved by Iraq’s Council of Ministers on 21 February.

The central oil gathering and treatment station at the Badra oil field includes three oil treatment lines with a capacity of 60,000 barrels per day, each taking approximately 18 months to construct.The commissioning of the first line is scheduled to the second half of 2013, when oil production is expected to begin at the oil field.The project will reach its full capacity of 180,000 barrels per day in the second half of 2015.A pump station, oil storage facilities, an oil metering station and other required equipment will also be constructed and installed within the project.

2012 will see Gazprom Neft continuing to hold tenders for infrastructure construction projects at the Badra oil field.This will include selecting contractors to build a 170-kilometer oil pipeline to the Garraf oil field, as well as a gas gathering & treatment station with a capacity of 1.5 billion cubic meters per year, a gas pipeline, infield pipelines and field infrastructure.

„Starting the construction of the oil gathering &treatment station and further development of oil field infrastructure is another key step in our plans for Badra. By the second half of 2013, we expect to begin producing oil at Badra with daily production reaching 170,000 barrels by 2017 or approximately 8.5 million tonnes of oil per year, as stipulated by our contract with the Government of Iraq,” said Vadim Yakovlev, First Deputy CEO of Gazprom Neft.


Origine : Communiqué Gazprom Neft

Voir la fiche entreprise de "Gazprom Neft"



Les dernières news de "Gazprom Neft"



Toutes les news de "Gazprom Neft"
 
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 
Recherche de news par tags

abu-dhabi acquisition adnoc aker-bp aker-solutions algeria algerie algerie alstom amec anadarko angola apache australia axens azerbaijan baker-hughes barents-sea bechtel bg-group bp brazil canada carburant cbi cgg chevron china chiyoda cnooc cnpc co2 commission-europeenne compressor conocophillips consommation cpdp deepwater discovery drilling e-on edf egypt emerson engineering eni equinor equinor exxonmobil feed flng flowline fluor fluxys fmc foster-wheeler fpso fsru fugro gabon gas gaz gazprom gazprom-neft gdf-suez ge germany ghana gnl gtt gulf-of-mexico hess india indonesia inpex iraq italy jacobs jgc kbr keppel licence lng lukoil lundin maersk-drilling malaysia mcdermott methanier mozambique natural-gas nigeria nigeria nord-stream north-sea norway novatek offshore oman omv opec pemex petrobras petrofac petronas pgnig pipeline platform qatar qatar-petroleum qatargas raffinerie refinery repsol rig riser rosneft russia rwe saipem santos saudi-aramco schlumberger senegal shale-gas shell socar sonatrach south-stream statoil subsea subsea-7 survey tap technip technipfmc texas total transocean tullow turbine ufip uk us vallourec vopak well wintershall wood-group woodside



Europétrole © 2003 - 2021