Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Equinor : Increased production from the Fram field
    édité le 11/02/2020 - Plus de news de "Equinor" - Voir la fiche entreprise de "Equinor"


Equinor : Increased production from the Fram field
A new gas module that was recently put on stream on the Troll C platform will accelerate and boost production from Fram by substantial profitable volumes.

Fram is an oil and gas field tied in to the Troll C platform. In 2017 the Fram partners decided to invest about NOK 1 billion in a new gas module, boosting the gas processing capacity on Troll C by a total of 3.5 million standard cubic metres per day. The decision was made in agreement with the Troll partners.

“The gas module accelerates gas production and capacity in the Fram licence for existing and new wells, adding valuable short-term value. At the same time the gas module allows new future discoveries to be tied in,” says Gunnar Nakken, senior vice president, operations west.

The investment was essential to further developing Troll C as a hub for the area.

“This is an exciting area. On behalf of the Fram license we made one of the largest discoveries on the Norwegian continental shelf in 2019 here, Echino South. In addition, several prospects are being considered for drilling”, says Nakken.

The slightly more than 400-tonne gas processing module featuring gas drying and cooling units was built by Aibel in Haugesund, whereas Aibel in Bergen was responsible for the engineering work. Overall some 300 people have been involved in the project.

“The project had a very important employment effect in a period of few new contract awards, and it was delivered without serious incidents and on budget,” says Geir Tungesvik, Equinor’s senior vice president for project development.

The oil and gas industry recently launched an ambition to reduce carbon emissions from the NCS to near zero by 2050, and on behalf of the Troll partners Equinor awarded a front-end engineering and design contract (FEED) for modifications of Troll B and Troll C to enable power from shore.

The main purpose of the electrification project is to reduce the emissions of CO2 and NOx from the Troll B and Troll C platforms, which will also reduce the climate footprint from tied-in fields such as Fram.

About Equinor

Equinor, is an international energy company with a proud history. Formerly Statoil, we are 20,000 committed colleagues developing oil, gas, wind and solar energy in more than 30 countries worldwide. We’re the largest operator in Norway, among the world’s largest offshore operators, and a growing force in renewables. Driven by our Nordic urge to explore beyond the horizon, and our dedication to safety, equality and sustainability, we’re building a global business on our values and the energy needs of the future.


Origine : Communiqué Equinor

Voir la fiche entreprise de "Equinor"



Les dernières news de "Equinor"



Toutes les news de "Equinor"
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024