Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Dresser-Rand Selected to Supply Equipment for an FPSO for the Aseng Field
    édité le 17/11/2009 - Plus de news de "DRESSER RAND" -


Dresser-Rand Selected to Supply Equipment for an FPSO for the Aseng Field
Dresser-Rand Group Inc. , a global supplier of rotating equipment and aftermarket parts and services, announced today that it will supply advanced turbomachinery for SBM Offshore (SBM) floating, production, storage and offloading (FPSO) vessel destined for Noble Energy's Aseng Field offshore Equatorial Guinea.

Dresser-Rand will supply gas compression and power generation packages. Dresser-Rand will provide 4 DATUM(R) centrifugal compression trains driven by electric motors and three DR-61G (LM2500) gas turbine generator sets. The compressor trains will be manufactured in Olean, NY, and the gas turbines will be engineered by Dresser-Rand Kongsberg and packaged at Samsung Techwin's facilities in Changwon, South Korea. As previously reported, Dresser-Rand booked the order in October 2009.

"We are very pleased that SBM has selected Dresser-Rand to supply the critical rotating equipment for this important project. Our team worked closely with SBM on selecting the best technology to meet application requirements and offer a single-source solution for compression and power generation," said Jesus Pacheco, Dresser-Rand's executive vice president, New Equipment Worldwide. This award is representative of the value our technology brings to our clients.

SBM Offshore signed a contract with Noble Energy for the provision, lease and operation of the FPSO, which will operate in 3,281 feet of water. The FPSO will have capacity to handle 120,000 barrels of liquid per day, including processing of 80,000 b/d of oil, injection of up to 150,000 b/d of water, as well as handling 170 million cubic feet of gas per day. The unit will have storage capacity for 1.6 million b/d of oil including up to 500,000 b/d of condensate.


Origine : Communiqué DRESSER RAND





Les dernières news de "DRESSER RAND"

 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024