Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • CNOOC: Bozhong 19-4 Oilfield Comprehensive Adjustment Project Commences Production
    édité le 24/09/2021 - Plus de news de "CNOOC" - Voir la fiche entreprise de "CNOOC"


CNOOC: Bozhong 19-4 Oilfield Comprehensive Adjustment Project Commences Production
CNOOC Limited announced that Bozhong 19-4 oilfield comprehensive adjustment project has commenced production.

Bozhong 19-4 oilfield comprehensive adjustment project is located in the south of Bohai Sea, with average water depth of about 21 meters. In addition to fully utilizing the existing processing facilities of Bozhong 25-1 oilfield, the project has built a new eight-legged central equipment platform. A total of 25 development wells are planned, including 18 production wells, 7 water injection wells. The project is expected to reach its peak production of approximately 11,000 barrels of crude oil per day in 2022.

CNOOC Limited holds 100% interest in Bozhong 19-4 oilfield comprehensive adjustment project and acts as the operator.

About CNOOC

China National Offshore Oil Corporation (SEHK: 00883, NYSE: CEO, TSX: CNU), the largest offshore oil and gas producer in China, is a mega government owned company operating directly under the State-owned Assets Supervision and Administration Commission of the State Council of the People's Republic of China.


Origine : Communiqué CNOOC

Voir la fiche entreprise de "CNOOC"



Les dernières news de "CNOOC"



Toutes les news de "CNOOC"
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2025