Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • BP: Production Begins at Greater Plutonio
    édité le 02/10/2007 - Plus de news de "bp" - Voir la fiche entreprise de "bp"


BP:  Production Begins at Greater Plutonio
Sociedade Nacional de Combustíveis de Angola (Sonangol E.P.), BP Angola (Block 18) BV, as the Operator, and Sonangol Sinopec International Limited (SSI) announce that production from the Greater Plutonio development area in Block 18, offshore Angola, started on 01 October 2007. It consists of five distinct fields discovered in 1999-2001 in water depths of up to 1,450 metres and is the first BP-operated asset in Angola.
The Greater Plutonio offshore development area is located 160 kilometres northwest of Luanda and is comprised of the Galio, Cromio, Paladio, Plutonio and Cobalto fields in water depths varying from 1200 to 1450 metres. It will contain 43 wells: 20 producers, 20 water injectors, and 3 gas injectors. The development utilizes a floating, production, storage and offloading vessel (FPSO) to process produced fluids and export crude. The FPSO is connected to the wells by a large subsea system.

The FPSO is 310 metres in length and has an oil storage capacity of 1.77 million barrels, oil processing of up to 240,000 barrels of oil per day, produced and treated water injection rate of 450,000 barrels per day, and gas handling of up to 400 million standard cubic feet per day. It is held in position by 12 mooring lines connected to anchor piles on the seabed.

The heart of the Greater Plutonio subsea system is the longest single riser tower system of its kind in the world. At some 1,258 m, it connects the FPSO to a network of subsea flowline and control systems that include 150 km of flowlines, 9 manifolds and 110 km of instrument and control umbilicals. Many components of the subsea systems, including the riser tower, were constructed and assembled in Angola, including 6 of the subsea manifolds along with the worlds largest CALM (Catenary Anchor Leg Mooring) offloading buoy and the first ever Angolan assembled and tested subsea trees.
Many Angolan technicians and engineers, whose numbers will continually increase over the next several years, have been trained to operate and support the Greater Plutonio development area in an ongoing 5 year development program.

Commenting on the news, BP chief executive Tony Hayward described the start of production from the first BP operated development offshore Angola as “a further significant step in the steady build-up of oil and gas output from new projects due on stream this year and next.”

Speaking in Luanda at the FPSO's inauguration last week, Hayward said: “The successful start-up of this complex of fields has significantly advanced BP’s development and use of innovative deepwater technology that will prove so important in accessing new resources around the world."


Origine : Communiqué bp

Voir la fiche entreprise de "bp"



Les dernières news de "bp"



Toutes les news de "bp"
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 
Recherche de news par tags

abu-dhabi acquisition adnoc aker-bp aker-solutions algeria algerie algerie alstom amec anadarko angola apache australia axens azerbaijan baker-hughes barents-sea bechtel bg-group bp brazil canada carburant cbi cgg chevron china chiyoda cnooc cnpc co2 commission-europeenne compressor conocophillips consommation cpdp deepwater discovery drilling e-on edf egypt emerson engineering eni equinor equinor exxonmobil feed flng flowline fluor fluxys fmc foster-wheeler fpso fsru fugro gabon gas gaz gazprom gazprom-neft gdf-suez ge germany ghana gnl gtt gulf-of-mexico hess india indonesia inpex iraq italy jacobs jgc kbr keppel licence lng lukoil lundin maersk-drilling malaysia mcdermott methanier mozambique natural-gas nigeria nigeria nord-stream north-sea norway novatek offshore oman omv opec pemex petrobras petrofac petronas pgnig pipeline platform qatar qatar-petroleum qatargas raffinerie refinery repsol rig riser rosneft russia rwe saipem santos saudi-aramco schlumberger senegal shale-gas shell socar sonatrach south-stream statoil subsea subsea-7 survey tap technip technipfmc texas total transocean tullow turbine ufip uk us vallourec vopak well wintershall wood-group woodside



Europétrole © 2003 - 2021