Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • BHP Billiton's Stybarrow Development Off Western Australia Exceeding Early Forecasts
    édité le 17/01/2008 - Plus de news de "BHP" - Voir la fiche entreprise de "BHP"


BHP Billiton's Stybarrow Development Off Western Australia Exceeding Early Forecasts
BHP Billiton today announced that its operated Stybarrow project offshore northwest has achieved sustained production levels at planned capacity. It was brought on stream in November approximately two months ahead of schedule.

Stybarrow has been producing consistently at design capacity of 80,000 barrels a day. One well has been operating at near record-setting rates for West Australia, producing approximately 32,000 barrels of oil per day. To date, in less than two months of operation, Stybarrow has offloaded a total of 2.5 million barrels of oil.

The achievement is based in part on the use of advanced real time monitoring technology delivering high standards of control and management of the flow from individual wells.

Downhole and subsea tree pressure and temperature gauges allow engineers to manage the drawdown to maximize production and ensure prudent management of the reservoir. The sophisticated monitoring equipment has also improved the operating efficiency of the FPSO topsides facilities.

The Stybarrow project involves a nine well subsea development and a Floating Production Storage and Offtake (FPSO) facility, the Stybarrow Venture.


Origine : Communiqué BHP

Voir la fiche entreprise de "BHP"



Les dernières news de "BHP"

 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024