Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Baker Hughes to Supply Liquefaction Trains for Sempra Infrastructure’s Port Arthur LNG Phase 1 Project
    édité le 28/03/2023 - Plus de news de "BAKER HUGHES" - Voir la fiche entreprise de "BAKER HUGHES"


Baker Hughes to Supply Liquefaction Trains for Sempra Infrastructure’s Port Arthur LNG Phase 1 Project
   - Contract awarded by Bechtel for Main Refrigerant Compressors (MRCs) includes two liquefaction trains, for a total of four Frame 7 turbines and eight centrifugal compressors
   - Baker Hughes will also provide two motor driven compressors for the plant’s boosting services
   - Technology capable of producing a nameplate capacity of approximately 13 million tonnes per annum (MTPA)

Baker Hughes, an energy technology company, announced Monday it has been awarded an order by Bechtel to supply two Main Refrigerant Compressors (MRCs) for Sempra Infrastructure’s Port Arthur LNG Phase 1 project in Jefferson County, Texas, following the positive Final Investment Decision (FID) announced March 20.

Through the Port Arthur LNG Phase 1 project, Sempra Infrastructure aims to deliver critical new export infrastructure in the U.S., which will help meet continuing growth in demand for liquefied natural gas (LNG). In total, Baker Hughes will supply four Frame 7 turbines paired with eight centrifugal compressors across two LNG trains – for a nameplate capacity of approximately 13 MTPA – as well as two electric motor driven compressors for the plant’s boosting services.

“We are delighted to be working with Bechtel and Sempra Infrastructure to supply critical equipment for this innovative LNG project,” said Baker Hughes Chairman and CEO Lorenzo Simonelli. “Baker Hughes has been committed to LNG for over 30 years, and today’s announcement builds on our track record of delivering high-availability and reliable LNG technology, with low total cost of operations, further enabling increased exports of LNG from the U.S. Gulf Coast to meet global energy needs.”

Baker Hughes’ proven gas technology solution chosen for Port Arthur LNG Phase 1 provides Sempra Infrastructure with the highest production levels for the plant’s design, as well as operational flexibility, high availability, and lower emission footprint. The Frame 7 turbine is well-proven for its energy efficiency, availability, reliability and maintainability.

Packaging of the turbine/compressor train, a unique Baker Hughes offering, as well as manufacturing of the compressors and testing of the trains, will take place at Baker Hughes’ facilities in Italy. The expected commercial operation dates for Port Arthur LNG Phase 1 Train 1 and Train 2 are 2027 and 2028, respectively.

About Baker Hughes

Baker Hughes (NASDAQ: BKR) is an energy technology company that provides solutions to energy and industrial customers worldwide. Built on a century of experience and conducting business in over 120 countries, our innovative technologies and services are taking energy forward – making it safer, cleaner and more efficient for people and the planet.

About Bechtel

Bechtel is a trusted engineering, construction and project management partner to industry and government. Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers’ objectives to create a lasting positive impact. Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world's infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place.

Bechtel serves the Energy; Infrastructure; Manufacturing & Technology; Mining & Metals; and Nuclear, Security & Environmental markets. Our services span from initial planning and investment, through start-up and operations.

About Sempra Infrastructure

Sempra Infrastructure delivers energy for a better world. Through the combined strength of its assets in North America, the company is dedicated to enabling the delivery of cleaner energy for its customers. With a continued focus on sustainability, innovation, world-class safety, championing people, resilient operations and social responsibility, its more than 2,000 employees develop, build and operate clean power, energy networks and LNG and net-zero solutions that are expected to play a crucial role in the energy systems of the future.


Origine : Communiqué BAKER HUGHES

Voir la fiche entreprise de "BAKER HUGHES"





Les dernières news de "BAKER HUGHES"



Toutes les news de "BAKER HUGHES"
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024