Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • ASSEN, VOPAK and GASUNIE decide not to go through with the Eemshaven LNG Terminal
    édité le 02/09/2010 - Plus de news de "GASUNIE" - Voir la fiche entreprise de "GASUNIE"


ASSEN, VOPAK and GASUNIE decide not to go through with the Eemshaven LNG Terminal
The study into the feasibility of an LNG terminal in the Eemshaven conducted by Essent, Vopak and Gasunie which was announced in 2007 has now been completed. The study has shown that there is insufficient basis to arrive at a positive investment decision.

Groningen Seaports – the company that manages Eemshaven and the port of Delfzijl - has placed the 65-ha area that was reserved for the terminal back on the market. Discussions are currently already underway with interested candidates. This 65-ha site is the last area available in the Eemshaven situated immediately next to deep water.


Origine : Communiqué GASUNIE

Voir la fiche entreprise de "GASUNIE"



Les dernières news de "GASUNIE"



Toutes les news de "GASUNIE"
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024