Newsletter 
  INSCRIPTION Inscription | ESPACE ANNONCEURS Publicité | CONTACT Contact |PLAN DU SITE Plan


Europétrole, le portail de l'industrie du pétrole
 
 accueil | actualité française | actualité internationale | recherche | interviews | focus | actualité par entreprise | actualité pétrole/gaz de schiste 
Partager :

  • Cheniere Partners Announces Substantial Completion of Train 4 at the Sabine Pass Liquefaction Project
    édité le 16/10/2017 - Plus de news de "Cheniere Energy" - Voir la fiche entreprise de "Cheniere Energy"


Cheniere Partners Announces Substantial Completion of Train 4 at the Sabine Pass Liquefaction Project
Cheniere Energy Partners, L.P. announced that Substantial Completion of Train 4 of the Sabine Pass liquefaction project in Cameron Parish, Louisiana (the "SPL Project") was achieved on October 9, 2017. Commissioning has been completed and Cheniere Partners' EPC partner Bechtel Oil, Gas and Chemicals, Inc. ("Bechtel") has turned over care, custody, and control of Train 4 to Cheniere Partners.

Under a sale and purchase agreement ("SPA") with GAIL (India) Limited, the date of first commercial delivery for Train 4 of the SPL Project is expected to occur in March 2018, upon which the SPA's 20-year term commences.

Over the last 17 months, Cheniere Partners and Bechtel have declared Substantial Completion on four liquefaction trains at Sabine Pass. With the achievement of Substantial Completion, financial results of LNG sales from Train 4 going forward will be reflected in the statement of operations of Cheniere Partners and its affiliates.

About Cheniere Partners

Through its wholly owned subsidiary, Sabine Pass LNG, L.P., Cheniere Partners (NYSE American: CQP) owns 100% of the Sabine Pass LNG terminal located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast.
The Sabine Pass LNG terminal includes existing infrastructure of five LNG storage tanks with capacity of approximately 16.9 billion cubic feet equivalent (Bcfe), two marine berths that can accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4.0 Bcf/d.
Through its wholly owned subsidiary, Cheniere Creole Trail Pipeline, L.P., Cheniere Partners also owns a 94-mile pipeline that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines.

Cheniere Partners, through its subsidiary, Sabine Pass Liquefaction, LLC ("SPL"), is developing, constructing and operating natural gas liquefaction facilities at the Sabine Pass LNG terminal adjacent to the existing regasification facilities.
Cheniere Partners, through SPL, plans to construct over time up to six liquefaction trains, which are in various stages of development, construction and operations. Trains 1 through 4 have commenced commercial operations, Train 5 is under construction, and Train 6 is being commercialized and has all necessary regulatory approvals in place.
Each liquefaction train is expected to have a nominal production capacity, which is prior to adjusting for planned maintenance, production reliability and potential overdesign, of approximately 4.5 million tonnes per annum ("mtpa") of LNG. SPL has entered into six third-party LNG SPAs that in the aggregate equate to approximately 19.75 mtpa of LNG and commence with the date of first commercial delivery of Trains 1 through 5 as specified in the respective SPAs.


Origine : Communiqué Cheniere Energy

Voir la fiche entreprise de "Cheniere Energy"





Les dernières news de "Cheniere Energy"



Toutes les news de "Cheniere Energy"
 
 
 
Emploi-Pétrole
 
Rechercher une news



française internationale








 
Les dernières news internationales


>> Toute l'actualité internationale     >> RSS
 



Europétrole © 2003 - 2024